Boiler Tube Bundle Replacement
Innovative Engineering and Maintenance swiftly replaced boiler tube bundles at cogeneration power plant in a short shutdown window of seven days. The mission was to replace two economizer and two preheater bundles. To reach success, Innovative Engineering and Maintenance designed and produced a plan which included cutting a window out of the side of the boiler, installing an in house engineered rail system, and multi-crane lift plan. The job was perfectly executed while working within a bustling community.
Click on any of the thumbnails below to view the full-size image